Installation is normally completed in approximately one week depending on the level of makeover that is being completed.
Preparation required before installation:
 |
Remove cabinet doors and drawer fronts
|
 |
Inspect for structural soundness and repair if necessary
|
 |
Inspect for damaged wood and repair if necessary
|
 |
Prepare cabinets for lamination: clean cabinets and sand off all chipped paint, varnish, and grease to insure proper bonding
|
Steps to quality installation:
 |
Formica ® laminate or wood veneer is bonded to all exposed end panels, rails and stiles
|
 |
New custom LeMica doors and drawer fronts are installed with new hinges and decorative hardware if selected
|
 |
Matching custom trim molding is installed if required
|
|
|